Wind Energy in Great Britain

Climate protection is forcing Great Britain's hand: According to the binding objectives of the European Union, the United Kingdom is obligated to cover at least 15 percent of its energy requirement with renewable energy by the year 2020. However, it is still has a long way to go, as the current share has only reached about 6 percent.

In terms of renewable energy, the Scottish government has set its aim even higher and wants to achieve 100 percent from renewables by 2020.

As wind power offers the best opportunities for a drastic increase, a distinct expansion is anticipated during the coming years. 1,897 megawatts were installed in Great Britain in 2012, compared to 1,298 megawatts in 2011. By the end of 2012 the overall installed capacity of wind power totalled 8,445 megawatts. In any case, the UK still offers numerous possibilities to install highly efficient wind farms.



ABO Wind UK Limited

At the end of 2011, ABO Wind achieved the breakthrough in the UK with the commissioning of the wind park Lairg in the Scottish highlands. This will facilitate the acquisition of further projects.

In the next few years ABO Wind wants to connect several wind farms to the grid in Scotland and England.

In the medium term ABO Wind expects to connect several projects o the grid in the UK. The team now consists of five employees and works on wind parks with a total capacity of 200 megawatts in different planning stages.
The subsidiary ABO Wind UK Limited is located in Edinburgh.

top

Contact


Christian Wild

phone:
+49 (0)611 26 765-565

fax:
+49 (0)611 26 765-599

christian.wild(at)abo-wind.de


Addresses:

ABO Wind UK Ltd
Suite 0/18, Alba Innovation Centre, Alba Campus
Livingston
EH54 7GA

Phone: 0800 066 5631
fax: 01506 592 120


ABO Wind UK Ltd
The Greenhouse,
Beechwood Park North
Inverness
IV2 3BL
 
Phone: 01463 713555


http://www.abo-wind.co.uk/